Archived Projects
Information on completed DPW projects can be found here
Ardsley Road Sidewalk Project
This project constructed (ADA) compliant concrete sidewalk and curbing along the north side of Ardsley Road from Fort Hill Road to Warnke Lane.
Crosshill Road Storm Sewer Replacement Project
This project generally consisted of replacing approximately 800 linear feet of storm sewer infrastructure on Crosshill Road from Rochambeau Drive to Topland Road.
Rumbrook-Knollwood Interconnection Transmission Main Project
This Town water infrastructure project involved the installation of over one mile of 30-inch diameter water main connected the Rumbrook Pump Station to the Knollwood Pump Station. More detailed information can be found by clicking here or the link above.
Map of Existing Sidewalks Throughout Greenburgh
Click here to view a map of existing sidewalks throughout the Town of Greenburgh. This map indicates which sidewalks are asphalt, concrete, or brick. The map also provides information as to the year certain sidewalks were constructed and their costs.
Summary of Curbing Work Throughout Greenburgh
Click here to view a map summarizing curbing work done throughout the Town of Greenburgh from 2014-2020.
Roadwork on Pipeline Road (Aqueduct Drive)
Please be advised that the Town of Greenburgh will begin roadwork on Pipeline Road (Aqueduct Drive) the week of July 20, 2020 and continue as weather permits. This entails two days of cleaning and preparing the existing roadway followed by three days of resurfacing. The limits of work include Pipeline Road (Aqueduct Drive) from DeSanti Plaza to the Bronx River Parkway.
Please be aware of the following traffic conditions for the duration of the roadwork:
Pipeline Road from Edgemont Place to the Bronx River Parkway will be closed to traffic between 7:00 am and 5:00 pm
Traffic on Pipeline Road from Edgemont Place to DeSanti Plaza will be maintained as best as possible; however, there may be minor delays between 7:00 am and 5:00 pm due to the roadwork.
If you have any questions, please contact the Bureau of Engineering at (914) 989-1583. Thank you in advance for your patience and cooperation. You may also email us at: Paving@greenburghny.com
Milling & Resurfacing - May 2020
Please be advised that the Town of Greenburgh will begin milling and resurfacing the following streets the week of May 11, 2020 and continue as weather permits. This entails that each street undergo a day of milling and a day of paving. Access to your driveways will be maintained as best as possible for the duration of the roadwork; however, please be aware that there may be minor delays due to the roadwork.
Group 1 (Beginning the week of May 11, 2020):
Sprain Road from Heatherdell Road to D.P.W. Yard Driveway
Underhill Road from Clayton Road to Vandelay Court
Group 2 (Beginning the week of May 18, 2020):
Glendale Road from Longview Drive to Moorland Drive
Westminster Road from Mt. Joy Avenue to Ardsley Road
Hadden Road from Ardsley Road to Paxford Lane
Old Army Road from Mt. Joy Avenue to Ardsley Road
Barclay Road from Roxbury Road to Edgemont Road
Group 3 (Beginning May 26, 2020)
Mountain Road from Blueberry Hill Road to Saw Mill Parkway